How to make an armopoyas on a foam block, a gas block

Why do you need an armopoyas for aerated concrete and foam block? A tape structure made of concrete, which follows the contours of the walls of the building and improves the strength characteristics of the erected structure, protects the structure from external and internal factors, such as load, soil deformation, wind gusts, and seismic activity. It also performs the connecting functions of individual walls of a building from blocks into a single one, while serving as a kind of stiffener. It is important to reinforce in the middle of the masonry or under the roof when building houses on a slope, which will minimize the destruction of the house or damage to the integrity of its parts.

Replace fittings for aerated concrete, expanded clay concrete, brick, foam block, mauerlat, that is, under the part of the building that connects the roof of the roof and the frame, mount a reinforced mesh or a seismic reinforced belt. The process begins after the completion of the construction of the foundation and walls. First, the formwork for the armopoyas https://sitkazahid.com/en/catalog/armopoyas-grid/c288 is formed, then concrete is poured.
Installation consists of the following steps:

  1. Determination of the size and height relative to the water level for the construction of the formwork. The diameter should correspond to the width of the masonry, be the same as the wall, and the height, according to the design documentation, should be 30 centimeters.
  2. Install the slats in the last row of the gas block or other material with a protrusion 300 millimeters higher than the masonry itself, while pulling the fishing line, and forming a high-rise beacon.
  3.  Direct installation of the formwork, fixing the boards from the outside and inside of the wall.
  4. Marking for floor slab beams and installation of fastening studs for quick and reliable connection of mortar structure with wood.
  5. Monolithic construction of a metal armored belt into a previously erected frame along the entire length of the wall. In places where the sides are connected - tie with wire.
  6. Gradual filling of the formwork with concrete in one day, as the concrete must set without breaking in time to prevent cracks in the base and corners. In this case, it is necessary to maintain the proportions of sand and gravel, according to the norm: one part of cement, three gravel, plus three sand.
  7. Analysis of the formwork. It is recommended to carry out the process no earlier than two days after allowing the mixture to dry.


Just a few steps and the reinforced belt is ready. Do not save money on the amount of armored belt, because high-quality material will withstand the weight of the floors, unfavorable atmospheric conditions, small deformations of the soil, which will indicate the strength of the building and preserve the original appearance of the structure for many years.